Tram Service between Calpe and Teulada
Hi,
Have the works on the Tram line between Calpe and Teulada finished and is the service back to normal now? I believe everything was supposed to be back by the 15th.
Many Thanks
Dave
Hi,
Have the works on the Tram line between Calpe and Teulada finished and is the service back to normal now? I believe everything was supposed to be back by the 15th.
Many Thanks
Dave
Posted: Sun Jul 16, 2023 12:43pm
Hi, yes, I saw this article last Thursday… good news 👍
Opened from today, the new bridge on line 9 that unites Benidorm to Denia. The tram line was closed from July 1st until today, to complete the connection, and to do the
testing of all the infrustructure necessary. The works on the 370 metre long new bridge cost 9.857.534 euros, The old steel bridge, which was constructed over a period of two years around 1915, will be kept, and adapted to form part of a hiking route.
JaneAli wrote on Sun Jul 16, 2023 12:43pm:
Hi, yes, I saw this article last Thursday… good news 👍
Opened from today, the new bridge on line 9 that unites Benidorm to Denia. The tram line was closed from July 1st until today, to complete the connection, and to do the
Read more...
testing of all the infrustructure necessary. The works on the 370 metre long new bridge cost 9.857.534 euros, The old steel bridge, which was constructed over a period of two years around 1915, will be kept, and adapted to form part of a hiking route.
Great Thanks
Find more Buses, trains and public transport topics from a particular area:
Or view all Buses, trains and public transport topics in all of Costa Blanca.